Our Projects

BUILT FOR SCALE. DELIVERED WITH PRECISION.

Project Delivery You Can Count On

Murray Constructions has been delivering infrastructure solutions across regional New South Wales and Victoria for over 40 years. From bridges and levee banks to large-scale civil upgrades, our team brings experience, reliability, and community-minded execution to every project.

We’re proud to showcase the results of our work—real projects with lasting impact.

RECENT PROJECTS

Crafting Infrastructure That Strengthens Communities

We understand that every job is unique. Whether it’s access to remote riverbanks, restoring transport links, or safeguarding regional towns from flood risk, we bring tailored planning, expert crews, and practical problem-solving to the table.

Our project history spans bridge construction & upgrades, flood levee and waterway projects, road & civil infrastructure delivery, complex regional engineering in remote conditions, and more. Check out our most recent projects below:

Picnic Point Boat Ramp

Safe, durable boat launch access for the Murray River. Delivered for Murray River Council, this project involved the upgrade and reconstruction of the Picnic Point boat ramp in Mathoura. The result was a reinforced concrete ramp and bank treatment that improved usability, durability, and safety for public watercraft access.

Sized for variable river levels
0 M Ramp
Faster, safer boat access
0 Lane Access
Ramp Construction

New cast-in-place concrete boat ramp installed over compacted riverbank

Bank Protection

Timber piles and structural reinforcement used for erosion control

Community Access Upgrade

Improved safety and convenience for recreational boaters and visitors

Durability in Design

Built to withstand high-traffic and seasonal river fluctuations

Levee Bank Upgrade

Protecting Wagga Wagga for the next 100 years.
Our team delivered a large-scale levee bank reconstruction designed to defend the city against a 1-in-100-year flood event. The project included over 6km of structural upgrades, accessibility improvements, and culturally respectful features that enhance both safety and community pride.

Newly reinforced levee system
0 km
Flood protection rating
0 Yr
Structural Upgrades

oncrete walls, sheet piling, crib walls, and earthworks for long-term stability

Urban Integration

Shared paths, ramps, and safer community access points

Cultural Recognition

Indigenous artwork featured across key pathways

Remote Access & Staging

Delivered in active urban settings with careful traffic and environmental management

Tarengo Bridge Replacement

Connecting communities through modern infrastructure. Delivered for Boorowa Shire Council, this project replaced an ageing 85-year-old timber bridge with a new, reinforced two-lane concrete structure. The upgraded Tarengo Bridge ensures safer transport and supports critical access between the Lachlan Valley Way and the Olympic Highway.

Replaced single-lane span
0 Lanes
Legacy timber bridge removed after nearly a century of use
0 Yr
Bridge Replacement

Old timber bridge replaced with reinforced concrete for long-term durability

Improved Safety & Capacity

Two-lane design enables safer and more efficient vehicle movement

Critical Link Restored

Re-established vital access between major transport corridors

Regional Development Support

Boosts infrastructure resilience for Boorowa and surrounding communities

Cullens Rd Bridge Replacement

Modern design for a vital creek crossing. Delivered for Strathbogie Shire Council, this project replaced an ageing timber bridge over Castle Creek with a new two-lane reinforced concrete structure. Located 13 km northwest of Euroa, the upgraded bridge improves road safety and removes previous load limits.

Wider two-lane bridge
0 m
Built for heavy freight
0 T
Bridge Upgrade

Timber bridge replaced with a two-lane concrete crossing over Castle Creek

Increased Width & Access

Widened to 7.4 metres for improved safety and usability

mproved Load Capacity

New structure designed to support full transport loads

Rural Link Reconnection

Critical infrastructure linking Clarkes and Geodetic roads

Birrie Bridge Replacement

High-capacity infrastructure for regional access. Completed for Brewarrina Shire Council, this project replaced a timber structure near Goodooga with a 100m-long, two-lane bridge. Murray Constructions managed full delivery of the six-span crossing, incorporating precast components, traffic management, and environmental protection measures throughout construction.

Six-span concrete bridge
0 M
MS1600 freight capacity
0 T
Full Span Construction

Delivered five headstocks, abutments, and approach slabs with formwork and concrete

Precast & Civil Works

Included precast deck panels and pile installation with onsite staging

Safety & Barriers

Fitted with W-Beam guardrails, bridge transitions, and traffic barriers

Environmental Controls

Erosion, sediment, and rock protection managed through all phases

murray-constructions-hlc

Contact Us Today!

Ready to Get Started on Your Next Civil Project?

Book a free consultation with the Murray Constructions team. We’ll discuss your goals, review site needs, and offer clear, practical advice to move your project forward.

Delivering high-quality civil construction services across regional NSW for over 40 years. Our experienced team partners with local governments, businesses, and communities to deliver infrastructure that lasts.